Trillion evStation’s

Trillion evStation

Version 5.0
Wednesday, July 19th
6 pm #stevenpaulcote @stevenpaulcote #elonmusk @elonmusk

Trillions of evStation’s are possible. On-demand and pre-arranged electric vehicles (EVs) including recreational vehicles are planned for at-location charging.
The actual number of electric vehicle charging stations is proportional and relational number of operating electric vehicles, including consideration for new purchasers operators and Private transportation fleets (including potentially Robotaxing services, without drivers and passive drivers operating immediately).

It’s not necessary to have a trillion charging stations. Internal combustion engine refueling stations reportedly numbered to be over 100,000 independent location he’s having a number of pumps. Refueling vehicles at home or other at other properties by the vehicle owner are rare. Practically nonexistent.

Tesla and Ford separately have a significant number of electric vehicle charging stations independently and now under reciprocal agreement EV owners can charge at other’s location in the future. Between home charging and Tesla/Ford opening charging to all electric vehicle owners prospectively, about 20% of the charging infrastructure needs are potentially in place at this time. This might mean that 80% charging infrastructure required, including home charging, needs to be independently developed.

Demographics, the demographics of current electric vehicle ownership and future electric vehicle owner is likely to change significantly. Individuals in small business fleets potentially for the future of electric vehicles ownership in addition to continuing current owner demographics.

Artificial Intelligence (AI) modeling and other behavioral technologies provide excellent decision-making support for providing electric vehicle charging.

evStation’s are planned for limited staffing, self-service operating, with some daylight hours humans. Humanoid’s (Robot’s are planned, when every available) 24/7/365 is planned for Participants access with 99.999 reliability.

Rapid development of temporary and semi-permanent charging stations is enabled with simplicity of design no civil engineering. Planned for Stations, utilizing existing paved streets with proven traffic calming methods, and parking lots: shopping centers and others. No plans for paving or canopies.

What3words Application on Smartphone enables, and works with Google Maps and Google Earth visually.

Electricity comes to the vehicle. Portable energy storage, advanced space Internet communication system and other advanced technologies, including Artificial Intelligence (AI) and potentially including Humanoid’s (Robots) enable capabilities.

Trillions of land and water geolocation planned to be served for Participants exclusively private subscriptions., evStation’s for EV charging, not open to the public, with special exceptions: Emergencies and as Executive team determines, including for select or groups of individuals.

Red, yellow & green color planned. Digital mapping planning to us color system to quickly show charging station square real-time status. The squares goes from red available location permitted square not operating (participants make square request). Then yellow colored square indicates plans to go green, not operating for charging or currently I occupied. Green meaning location is operating and available.

Participants are the Consumers and Providers provide under the Platform model. It’s not the franchising model. Not defacto franchising. No geographic exclusivity or same name requirements and many others aspects.

Venues selected for fun, playfulness, culture activities and other purposes, while waiting for charging.

Public Properties including on Street locations plan to be supported with charging. Private properties including indoor parking garages plan to be fully supported.

Opt-in property owners can opt-in to charging program including electric vehicle
Valet amenity (evValet) privately branded service for restauranteurs, resorts and many others. EV owners can opt-in to rental and other revenue programs.

Semi and other high-capacity batteries to use greolocated facilities next to significant power generation facilities.

Join today!

Featuring Tesla’s, all makes and models of vehicles are planned to be supported.

Equilibrium, planing efficient supply and demand situation resulting in equilibrium. Electric vehicle charging infrastructure requirements are more scientific not speculation.

Private sector initiatives no plans for public sector involvement considered or contemplated.

Original equipment manufacturers (OEMs) of electric vehicles (EVs) like Tesla and Ford, are unlikely interested is designing, developing and operating charging stations.

Most likely a lost leader, significant upfront development cost and little revenues resulting in a terrible rate of return on investment (ROI). The solution to recharging electric vehicles is not the responsibility or domain of electric vehicle manufacturers.

Ford motor vehicle company has been in business for a long time, and don’t see any Ford gas stations or other vehicle manufacturers.

EV manufacturers developed charging networks to encourage vehicle to purchase EVs. That requirement has concluded, public policy is influencing the buying habits of vehicle owners towards electric vehicles.

It’s now time for independent private sector to fulfill electric vehicle charging requirements, including innovative home charging solutions.

Passive drivers program immediately expands opportunities (autonomous driving regulatory relief) for transport of people and products, without vehicle emissions, no pollution solutions.

Disclaimer; information and visual images are conceptual only, no formal commitments have been made by any participant for Hardware, software or services. This information contains forward-looking concepts and statements. Void where prohibited this is not a solicitation. Open-source information.

Philanthropist and EV owners wanted immediately to help make it better world.

Here’s to you. What you to have it all. All that you can imagine.

Participants treated as esteem guests!

Call to action !!!

Background:

Tesla’s new Supercharger V4 with a station spotted under construction in Harderwijk, the Netherlands.

100,000 charging stations possibly need for electric higher charge rate for vehicle charging. 999,999 more needed.

Tesla’s is a great original equipment manufacturer (OEM) of electric vehicles. Elon is a brilliant product architect. Tesla designing, developing and operating charging stations is strange.

You do not see any General Motors or Ford petroleum gas station? Ford does have EV charging stations. In the future EV owners reportedly will be able to charge at both Tesla/Ford charging stations.

evStation’s new game plan coming soon. Join the revolution for electric vehicle charging and more. Philanthropist wanted immediately.

Call to action…. To help make a better world.

Subscribe today, void where prohibited.

Article:

Last year, we reported on Tesla’s Supercharger V4 design being revealed in the plans for a new station. Tesla is believed to be ramping up production of the new charger in order to start deployment soon. The new charger is expected to feature a potential for a higher charge rate (which is currently capped at 250 kW for the Supercharger V3) and a solution to allow CCS charging for non-Tesla electric vehicles.

The CCS solution was later revealed to be the Magic Dock, but we have only seen it deployed on Supercharger V3 stations, and the V4 had yet to show its face until now.

Now we learn that Tesla has started to deploy the new Supercharger V4 with a station being spotted under construction in Harderwijk, the Netherlands:

What3words:

57 trillion squares

57 trillion squares of three-word addresses
Founded in 2013, what3words is a London startup that has risen to international fame, with its new approach to addresses. By dividing the world into 57 trillion squares of 3 x 3 metres each, the geocode system has resulted in a new address system.

Feb 28, 2023

57 trillion addresses to cover the world

To make what3words precise enough to refer to an entrance or parking spot, it needed to be accurate to a 3m square. This meant we needed 57 trillion addresses to cover the world, and three words allowed us to create 64 trillion addresses – covering the entire world with quite a few spare! If we’d used only two words, we’d only have had enough for 1.6 billion squares

What3words divides the world into a grid of 57 trillion 3-by-3-metre (10 ft × 10 ft) squares, each of which has a three-word address

Chris Sheldrick, Co-Founder and CEO of what3words, reveals how he went against the grain to raise over £100m, change human behaviour, and build a new global address system, now used by major car brands, ecommerce platforms, and emergency services globally.
Jan 23, 2023

Electric Vehicle’s by Tesla planned (including on and off road) potentially, aquatic Cybertruck’s.

Satellite space communication system by SpaceX (Starship vehicle & Starhome properties supported) by Starlink

Energy Storage by Tesla planned.

Traditional petroleum stations for internal combustion engine (ice) design and development model is not necessary to follow for electric vehicles (EVs).

Nothing about petroleum gas stations should be considered or followed. No need for site locations to be located for consumers response. Overhead canopies for shade or weather protection of consumers is not necessary or practical.

Making canopies solar panels enabled does not justify the cost and expense. Solar generation better to be produced and at other locations more cost effectively, efficiently and sustainably.

Electric vehicle stations do not require large underground stores of flammable liquids.

EV Stations development starts with new vision, innovations and plans.

Electric vehicles home charging must factored as a component of transportation. Ability to generate electricity for vehicles, by vehicle owners is a significant consideration for electric vehicle transportation.